2025 Bond Issue - High School #2
2025 Bond Issue - High School #2
The 2025 bond issue was approved by 71% of voters in a special mail-in election on March 11, 2025. This $112 million bond issue will fund the construction of a second high school, ensuring space for the increasing number of students in Bennington Public Schools. The new high school is planned to open for the 2028-29 school year, serving the current 5th-8th grade students.
Fast Facts:
- Levy Impact: Tax Rate Increase will be 0.0 cents
- Total Bond Issue: of $112,000,000
- Total Project Cost: $124,645,829*
- *BPS will be using $12,645,829 of the District reserves.
- Timeline: Open for the 2028-29 school year
-
High School #2 Site Plan
-
High School #2 Floor Plan
Scope of the Project
-
Location: 180th Street and Military Road
Intrastructure: Paving the gravel road on 180th street. The northern section of the property will not be developed.
Timeline: Open for the 2028-29 school year -
The second high school will be built for a capacity of 1,000 students with the capability to expand to 1,500 students.
Components being built for 1,000 student capacity- Classrooms
- 700 Parking Stalls
Components being built for 1,500 student capacity
- Cafeteria
- Hallways
- Bathrooms
- Collaborative Spaces
- Offices
- Auditorium
- Locker Rooms
- Competition Gym
-
- 26 Classrooms
- Core Instruction
- 6 Science Labs
- 2 Flex Labs
- Visual Arts
- Business
- Fine Arts
- Auditorium
- Vocal & Instrumental Music Classrooms
- Career & Technical Education (CTE)
- High School #2
- Small Engines, Welding, Health Sciences Pathway
- Bennington High School
- Construction Trades, Drafting, Education Pathway
- Students will be provided the option to go to either school for CTE courses.
- High School #2
Other Spaces include:
- Media Center
- Counseling Center
- Common Teacher Plan Space
- 26 Classrooms
-
Physical Education
- Competition & Auxiliary Gyms
- Track and Field
- Weight Room
- Locker Rooms
Extracurricular Activities
Provide the same opportunities at both schools:- Practice/Lower Level Turf Field
- Varsity Contests Will Be At the Current High School Stadium
- Wrestling Rooms
- Baseball Field
- Softball Field
- Tennis Courts